ABB 650 Series Engineering Manual page 104

Relion protection and control
Hide thumbs Also See for 650 Series:
Table of Contents

Advertisement

Section 7
IEC 61850 communication engineering
98
third party IED's are included in the SCD-file. For example sending
GOOSE messages to ABB IED's included in the current project.)
4.5. Start Import when the file definition has been completed. A progress
window presents the import procedure.
5.
Make connections from sending IEDs to receiving function blocks in SMT.
5.1. Make connections between the signals that the server is sending and all the
GOOSE receive interface function blocks included in the application
configuration on the client's side.
If a client is defined for GOOSE receive then at least one cross in
SMT is required to be able to write the configuration to the IED.
Be sure to set the setting Operation to On in PST for all included
GOOSE receiving function blocks in the application
configuration to enable GOOSE communication.
6.
Write the configuration to the IED, see
Note that the engineered data is written to the IED when
executing a common Write to IED operation.
1MRK 511 284-UEN A
Figure
69.
Engineering manual
650 series

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion 650 series

Table of Contents