ABB 650 Series Engineering Manual page 107

Relion protection and control
Hide thumbs Also See for 650 Series:
Table of Contents

Advertisement

1MRK 511 284-UEN A
650 series
Engineering manual
1.
Select Yes in the Update Communication window to update the communication
configuration part in the IED.
2.
Click No in the Update Communication window to keep the communication
configuration part in the IED. Other parts of the configuration will be updated.
If no changes have been done in the communication configuration
part, click No in the Update Communication window.
IEC09000729 V1 EN
Figure 71:
Update the communication configuration in the IED with the
configuration made in PCM600
IEC 61850 communication engineering
Section 7
IEC09000729-1-en.vsd
101

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion 650 series

Table of Contents