Huawei NetCol5000-A User Manual page 131

42 kw air cooled in-row precision air conditioner
Hide thumbs Also See for NetCol5000-A:
Table of Contents

Advertisement

NetCol5000-A 42 kW Air Cooled In-row Precision Air
Conditioner
User Manual
Figure 4-37 Humidifier commissioning
Step 8 After the humidifier commissioning, the condensate pump commissioning screen is displayed.
Check whether the condensate pump vibrates and generates operating sound.
Figure 4-38 Condensate pump commissioning
Step 9 After the condensate pump commissioning, the cooling system commissioning screen is
displayed. Check whether the electric heating belt is firmly attached to the compressor outer
wall and whether there is noticeable temperature rise by touching the belt surface.
Issue 01 (2017-07-27)
If yes, select Yes, and tap Submit within the time limit displayed on the screen.
If no, select No, and tap Submit. The commissioning has failed. Locate and rectify the
faults of the condensate pump.
If yes, select Yes, and tap Submit within the time limit displayed on the screen.
If no, select No, and tap Submit. The commissioning has failed. Locate and repair the
faults of the electric heating belt.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4 Commissioning
123

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents