Parameter Setting; Parameter Setting Of The Cp-2014/Cpcx25 - Siemens SICAM AK Manual

Rtus. redundancy,
Table of Contents

Advertisement

Redundancy via SCA-RS
Necessary modules and cables
CP-2017 processing and communication
Base unit
Processing and communication element
SICAM AK
CP-2017/PCCX25
CM-2838 connection communication (CP-2017)
SM-2556/ETA2
CM-2860 patch plug standard V28,ET,TR
Cable 
Patch cable Cat.5 (4x2) AWG26/7
1.2.3

Parameter Setting

Firmware versions (status 10/2013):
M: CP-2014/CPCX25 (Master Control Element)
C4: CP-2017/PCCX25 (Processing and Communication Element)
C5: CP-2017/PCCX25 (Processing and Communication Element)
1.2.3.1

Parameter Setting of the CP-2014/CPCX25

In the OPM system technique select Redundancy Control under the Redundancy node
below the M-CPU:
In the Value dropdown list select the entry CPU-Redundancy.
Other selection options:
No redundancy
The following options are intended for redundant AUs:
Global redundancy switchover with SCA-RS
Global redundancy switchover with application-related voting
Line-by-line redundancy switchover with SCA-RS
Line-by-line redundancy switchover with application-related voting
32
Designation
Unrestricted
Item Number / MLFB
BC2-017 / 6MF10130CA170AA0
BC2-838 / 6MF10130CJ380AA0
BC2-556 / 6MF10130CF560AA0
CA2-860 / 6MF12110CJ600AA0
T41-255 (1m) / 6MF13040BC550AA0
T41-251 (2m) / 6MF13040BC510AA0
T41-252 (3m) / 6MF13040BC520AA0
T41-253 (5m) / 6MF13040BC530AA0
T41-254 (10m) / 6MF13040BC540AA0
SICAM RTUs, SICAM AK Redundancy
Edition 10.2016, DC2-026-2.07

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents