Siemens 6GK1 901-1GB01 System Manual page 18

Passive network components. industrial ethernet / profinet
Table of Contents

Advertisement

Instructions for fitting connectors, attachments and devices
2.3 Electrical networks
14. Open the cover of the contact
holder.
15. Place the wires in the guide slots
according to the colored markers on
the contact holder.
21. Secure the position of the contact
holder by tightening the forcing nut.
22. Push the housing over the contact
holder. The latch of the rear wall
must be on the same side as the
labeling of the casing.
18
16. Contact the wires by pressing down
the cover with a tool or hard object.
17. Align the cable so that the shield foil
lies between the shield clips of the
contact holder.
23. Press the rear wall into the housing
until it clicks into place audibly.
Avoid pressing on the seal around
the rear wall.
24. Tighten the forcing nut completely.
18. Push the sealing ring into the rear
wall and screw the forcing nut over
it loosely.
19. Turn the rear wall so that the latch
is on the same side as the RJ-45
release catch.
20. Push the contact holder into the
rear wall as far as the limit stop.
The limit stop must not jut out over
the cover of the contact holder.
Opening the plug:
1. To open the plug, lever the catch in
the housing towards the side wall
with a slotted screwdriver.
2. Pull the rear wall out of the housing
by the cable while holding down the
screwdriver.
Passive network components
System Manual, 02/2013, C79000-G8976-C282-01

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

6gk1 901-1ga006gk1 901-1gb00

Table of Contents