Siemens 6GK1 901-1GB01 System Manual page 73

Passive network components. industrial ethernet / profinet
Table of Contents

Advertisement

Figure 2-6
Energy connector - fitting
Fitting connectors to cables
1. Push the clamping screw (a), pinch ring (b) and sealing ring (c) over the cable.
2. Strip the jacket and wires as shown in the drawing.
3. Fit the 0.75 mm² wire-end ferrules to the stranded wires.
4. Push the connector sleeve (d) over the wires.
5. Screw the wires into the screw terminals of the female or male connector insert as shown
6. Push the connector sleeve (d) onto the female or male insert (e) and screw the two parts
7. Push the pinch ring (b) over the sealing ring (c) and press the two parts together with the
8. Screw the pressure nut tight.
Pin assignment
View of the connector
face
Passive network components
System Manual, 02/2013, C79000-G8976-C282-01
in the chart.
together.
pressure nut (a) into the connector sleeve.
Pin
(6GK1905-0EA00)
Pin 1
Pin 2
Pin 3
Pin 4
Pin 5
Instructions for fitting connectors, attachments and devices
Cable
Wire 1
Wire 2
PE
Wire 3
Wire 4
Socket
View of the connector
(6GK1905-0EB00)
face
Pin 1
Pin 2
Pin 3
Pin 4
Pin 5
2.5 Power supply
73

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

6gk1 901-1ga006gk1 901-1gb00

Table of Contents