Fitting Ie Hybrid Cable 2X2 + 4X0.34 And Ie Fc Rj-45 Modular Outlet - Siemens 6GK1 901-1GB01 System Manual

Passive network components. industrial ethernet / profinet
Table of Contents

Advertisement

Keep to the instructions in the SCALANCE W manual for fitting an IP67 hybrid cable
connector to a SCALANCE W device!
2.3.10.3

Fitting IE hybrid cable 2x2 + 4x0.34 and IE FC RJ-45 modular outlet

Introduction
The individual steps required to assemble an IE hybrid cable 2x2+ 4x0.34 and an IE FC RJ-
45 modular outlet are explained below.
Note the information in the assembly instructions of the plug.
Note
Instructions for assembly
 The IE Hybrid Cable 2x2 + 4x0.34 6XV1870--2J is not suitable for operation of the 2FE
 The insulation-piercing contacts of the IE FC RJ-45 plug 4x2 can be released and
 Once the ends of cables have made contact, do not make contact with them again but cut
Note
Conditions for use of the power insert
Use the power insert only under the following conditions:
 Extra-low voltages SELV, PELV to IEC 60364-4-41
 In USA/CAN with power supplies according to NEC class 2
 In USA/CAN, the cabling must meet the requirements of the NEC/CEC
 Current load maximum 0.5 A.
Passive network components
System Manual, 02/2013, C79000-G8976-C282-01
WARNING
insert or 1GE insert!
recontacted with the same cable cross section up to 10 times.
them off.
Instructions for fitting connectors, attachments and devices
2.3 Electrical networks
43

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

6gk1 901-1ga006gk1 901-1gb00

Table of Contents