Siemens 6GK1 901-1GB01 System Manual page 68

Passive network components. industrial ethernet / profinet
Table of Contents

Advertisement

Instructions for fitting connectors, attachments and devices
2.4 Optical networks
19. Turn the "Cleave" wheel slowly from
setting "0" to setting "2".
22. Check the assembled plug with the
microscope.
23. Then place the dust protection cap
on the ferrule.
26. Clean the contaminated connector
with the card cleaner by rubbing the
connector in one direction over a
clean area.
Note
If you find that the edge breaks are on the increase, send in the cleave tool for inspection.
When used correctly, up to 2000 assemblies are possible.
If you need to return the tool, talk to your Siemens contact.
68
20. Turn the "Clamp" wheel in the
direction of "Open" and remove the
fiber remnant.
Unlock the connector and remove it.
The plug surface is OK. Slight
irregularities at the edge are of no
significance.
24. Clean a contaminated plug with the
card cleaner
27. The main body of the connector clicks into place in the SC RJ housing. The
flat side of the main body is against the inner bar. The arrow on the orange
core points in the same direction as the arrow on the SC RJ housing.
21. Dispose of the fiber remnants in the
supplied container.
Greater irregularities in the broken
edg
es and irregular light distribution
ind
icate a damaged connector surfa
25.
Repeat th
e connector assembly.
Passive network components
System Manual, 02/2013, C79000-G8976-C282-01
ce.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

6gk1 901-1ga006gk1 901-1gb00

Table of Contents