ABB PST Series Installation And Commissioning Manual page 115

Table of Contents

Advertisement

1SFC132003M0201
&KDSWHU  0DLQWHQDQFH
This chapter describes the maintenance required for the
softstarter. In principle, the product is maintenance free
but some items should be checked regularly.
&DXWLRQ
'R QRW RSHQ WKH VRIWVWDUWHU RU WRXFK DQ\ OLYH SDUWV ZKHQ
WKH PDLQ DQG VXSSO\ YROWDJH LV FRQQHFWHG

5HJXODU PDLQWHQDQFH
• Check that all mounting bolts/screws are fastened.
Tighten if necessary.
• Check that all connections of main, control- and supply
circuits are fastened. Tighten the terminal screws and
bolts on the connection bars, if necessary.
• Check that the cooling airways are free from dirt and
dust. If required, use pressurised air to clean.
• Check external filters. Clean, if necessary.
• Check that the fan is working and rotating freely. The
blades shall rotate without any resistance and this can
be checked at voltage free state.
• Check the real time clock and adjust if necessary.
In case of a fault or if a fault can not be reset, see Chapter
11 "Trouble shooting" .
&KDSWHU 
0DLQWHQDQFH
115

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents