ABB PST Series Installation And Commissioning Manual page 15

Table of Contents

Advertisement

1
Power on
Fault
Protection
U1 ÇÂ
C15
Gq€‡
)LJXUH 
1
Status indication LEDs
2
LCD display
3
Selection keys for selecting, changing and
storing parameters
4
Navigation keys for navigating in the
menus
Arrows shown in the display indicates that
the value/menu is possible to change or
scroll
L1
L2
L3
N
Stop
KM1
1L1 3L2 5L3
1 2
3
2T1 4T2 6T3
6 7
8 9
U
V
W
M
3
)LJXUH  6WDQGDUG FRQQHFWLRQ 367
Power on
Fault
Protection
7

+#
/GPW
)LJXUH  7RS OHYHO
1SFC132003M0201
&KDSWHU  4XLFNVWDUW
2
3
4

Start
4 5
10
Start
Stop
4 5
10
11
12 13 14
15 16 17 18 19 20
This chapter is a short guide to how to connect, do the
configuration and start the softstarter in the easiest way.
:DUQLQJ
0RXQWLQJ HOHFWULFDO FRQQHFWLRQ DQG VHWWLQJV RI WKH
VRIWVWDUWHU VKDOO EH PDGH LQ DFFRUGDQFH ZLWK H[LVWLQJ
ODZV DQG UHJXODWLRQV DQG EH SHUIRUPHG E\ DXWKRULVHG
SHUVRQQHO
'R QRW FKDQJH DQ\ SDUDPHWHUV LQ WKH 6HUYLFH 6HWWLQJV
PHQX
&RQQHFWLRQ
1. Mount the softstarter according to Chapter 4 "Mount-
ing" .
2. Be aware of the ambient temperature.
Derating is required above 40
3. Connect the main circuit: terminals 1L1 - 3L2 - 5L3 to
the line side and terminals 2T1 - 4T2 - 6T3 to the motor
side.
4. Connect the supply voltage: terminal 1 and 2
(100-250V 50/60Hz).
5. Connect the functional ground: terminal 3.
7KH ZLUH VKDOO EH DV VKRUW DV SRVVLEOH DQG EH FRQQHFWHG WR
WKH PRXQWLQJ SODWH
7KH PRXQWLQJ SODWH VKRXOG DOVR EH
HDUWKHG
6. Connect the start/stop circuits: terminal 4, 5, 8, 9 and
10 according to the diagram.
7. Check that the main and supply voltage corresponds to
the softstarter ratings.
8. Switch on the supply voltage.
9. The green "Power on" LED is on and the LCD shall
appear as in figure 3.
&KDSWHU 
4XLFNVWDUW
°
°
C (104
F).
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents