NEC Express5800 Series Maintenance Manual page 141

Hide thumbs Also See for Express5800 Series:
Table of Contents

Advertisement

Chapter 2 Configuring and Upgrading the System
(2)
Installing Full Height PCI Board
1.
Shut down the OS.
The server is automatically powered off.
2.
Disconnect the power cords from the outlets.
3.
Remove the CPU/IO module referring to Chapter 2 (5.4.1 Removing CPU/IO Module).
4.
Remove one screw that secures the stopper and
remove the stopper.
5.
Remove three screws that secure the Riser
Card, and remove the riser card from the
motherboard.
6.
Remove one screw that secures the stopper and
remove the stopper from the Riser Card.
7.
Verify the location of the PCI slot.
Express5800/R320c-E4, R320c-M4 Maintenance Guide (VMware)
5. Installing Optional Devices
Stopper
Stopper
141

Advertisement

Table of Contents
loading

This manual is also suitable for:

Express5800/r320c-m4Express5800/r320c-e4

Table of Contents