ABB ACS5000 User Manual page 81

Water-cooled
Hide thumbs Also See for ACS5000:
Table of Contents

Advertisement

5. Route the cables along the pre-installed white cable brackets and
through the designated openings (1) into the front of the cable duct.
Use cable binders to fix the cables to the cable brackets.
Figure 5-6 Cable duct openings (example with 1700 mm PCU)
6. In the cable duct at the front, connect the cables according to
"Appendix D – Wiring diagrams".
3BHS799208 E01 REV E
ACS5000 WATER-COOLED USER MANUAL
05 MECHANICAL INSTALLATION
1
81/186

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents