3.2

Mechanical installation: Checklist

Use the following checklist to guide you through the mechanical installation procedure for the
cabinet/transport unit. Read the Chapter "Fundamental safety instructions" before you start
working on the cabinet.
For installation instructions, see the following sections or refer to the documents listed in the
table below.
Note
Checking the checklist
Check the boxes accordingly in the right-hand column if the option involved applies to the
scope of delivery. In the same way, check the boxes once you have finished the installation
procedure to confirm that the activities have been completed.
Table 3- 1
Mechanical installation: Checklist
Item
Activity
1
Check the transport indicators prior to installation.
(→ See Chapter "Installation/preparation", Section "Transport indicators")
2
Check the cabinet center of gravity shown on the label provided.
3
The ambient conditions must be permissible.
(→ See general technical data in Chapter "System overview", Section "System data")
4
The load-carrying capacity and properties of the ground must fulfill the requirements
for installation of the Cabinet Modules.
(→ See Chapter "Cabinet Modules" in the technical data for the relevant Cabinet Mod-
ules)
(→ See Chapter "Mechanical installation", Section "Preparation")
5
The crane transport assembly (option M90) installed for delivery must be removed
once the transport unit or individual cabinet units have been set down at the final in-
stallation location.
(→ See Chapter "Installation", Section "Disassembling the crane transport assembly")
6
Before the cabinet units are finally installed, the wooden pallets supplied with the
transport unit must be removed properly.
(→ See Chapter "Installation", Section "Lifting from the transport pallet and installing
the cabinet units")
7
The required minimum ceiling height must be observed. The cooling air supply and
discharge must not be obstructed and must provide an adequate quantity.
(→ See Chapter "Installation", Section "Preparation")
8
The cabinet must be firmly attached to the fixing points provided.
The cabinet units must be correctly connected with one another.
The collecting pipes of the cooling circuit must be connected.
(→ See Chapter "Installation", in Section "Mechanical connection of the cabinet units")
9
If it is possible to enter the area underneath the cabinet units, plant-side touch protec-
tion must be provided for this area.
Cabinet Modules liquid cooled
Equipment Manual, 04/2020, A5E37067587A
Mechanical installation
3.2 Mechanical installation: Checklist
Applicable?/Completed?
47

Advertisement

Table of Contents
loading

Table of Contents