5 UTILITY PACKAGE (GX Configurator-TC)
5.6 Monitoring/Test
5 - 20
[Purpose]
Start the buffer memory monitoring/testing and I/O signals monitoring/testing
from this screen.
[Operating procedure]
Select monitor/test module window
"Module model name"
*1: Enter the start I/O No. in hexadecimal.
The window can also be started from System monitor of GX Developer Version 6
or later.
For details, refer to the GX Developer Operating Manual.
[Setting window]
"Start I/O No.
Monitor/test
MELSEC-Q
*1
"
"Module type"
5 - 20