GE LOGIQ E9 Service Manual page 358

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5573152-100, R
IRECTION
8-5-20
Main Cable Cover replacement
8-5-20-1
Manpower
One person, 15 minutes.
8-5-20-2
Tools
For tools needed, refer to:
8-5-20-3
Preparations
When preparing for the replacement, you must perform the following steps:
1.) Power down the system
2.) Disconnect the mains power cable from the wall outlet.
3.) Disconnect all Probes and External I/O Cabling.
4.) Remove the Side Covers.
5.) Remove the Top Cover.
6.) Remove the four screws to the Column Cover Assembly.
Follow these links if you need more information:
4-2-3 "Power shut down" on page 4-6.
8-5-3 "Side Covers replacement" on page 8-28.
8-5-5 "Top Cover replacement" on page 8-35.
8-5-19 "Column Cover Assembly replacement" on page 8-70.
8-5-20-4
Main Cable Cover removal
1.) Remove the Main Cable Cover.
Figure 8-27 Main Cable Cover (Column Cover overlaps Main Cable Cover)
8 - 74
. 2
EV
8-2-5 "Tools needed for servicing the LOGIQ E9" on page
Section 8-5 - Replacing Covers and Bumpers
LOGIQ E9 S
M
ERVICE
ANUAL
8-5.

Advertisement

Table of Contents
loading

Table of Contents