GE LOGIQ E9 Service Manual page 401

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5573152-100, R
IRECTION
8-6-3-3
Monitor Arm assembly (Ergotron) replacement - R5.x and later production
This procedure assumes that the Monitor and Bulkhead Cover have been removed.
NOTE:
On R6 and later production, there are two Monitor versions, 23 inch Monitor and 22 inch OLED
Monitor. The Cables that connect the Monitor to the Bulkhead Board are different. This
procedure covers both R5 and R6 and later.
Table 8-74
1.
WHEN REMOVING THE MONITOR ARM,
KEEP THE ARM LOCKED, AS SHOWN
TO ENSURE THE MONITOR ARM
ASSEMBLY IS IN THE LOCKED
POSITION UNTILL THE ARM AND
MONITOR ARE INSTALLED. THE
SPRINGS TO SUPPORT THE MONITOR
CAN CAUSE THE ARM TO SPRING
OPEN CAUSING SEVERE PERSONAL
INJURY AND PROPERTY DAMAGE.
2.
For R5 production Bulkhead Board:
19 inch Monitor and Bulkhead Board
P/N GA200290 or P/N 5482676.
Disconnect the Monitor and Arm cables;
Video (P10) and power/USB (P3) and the
ground Cable from the Arm (A).
Disconnect the ground Cable for the Upper
section of the Arm (Ab) from the Bulkhead
Board (A).
Go to Step 5.
. 2
EV
Monitor Arm assembly (Ergotron) removal - R5 and later production
Steps
WARNING
WARNING
Chapter 8 Replacement procedures
LOGIQ E9 S
Corresponding Graphic
Monitor Cables to Bulkhead - R5
M
ERVICE
ANUAL
8 - 117

Advertisement

Table of Contents
loading

Table of Contents