Installing The Internal Device Bay Expansion Kit; Unpacking The Internal Device Bay Expansion Kit - NEC Express5800 320La User Manual

Hide thumbs Also See for Express5800 320La:
Table of Contents

Advertisement

Installing the Internal Device Bay Expansion
Kit
Note:
The following subsections provides the procedures for installing the Internal
Device Bay Expansion Kit into the tape drive module housing, which is
included with tower-based systems only. After installing the expansion kit, then
5.25-inch tape backup drives can be installed in the device bays.
Before installing the Internal Device Bay Expansion Kit you must first remove
the front door and the top cover of the tower-based unit. Then the new hardware
components can be installed into the existing tape drive module housing.

Unpacking the Internal Device Bay Expansion Kit

Although the expansion kit hardware is inspected and carefully packaged at the
factory, damage may occur during shipping. Follow these steps for unpacking.
1. Visually inspect the shipping containers; notify your carrier immediately of
any damage.
2. Carefully remove the kit hardware and verify the parts listed below. If parts
are missing or the hardware is damaged, notify your service representative.
Power supply unit
!
Cooling fan
!
Finger guard
!
Power cord
!
Power cable
!
Device DC power distribution cable
!
Internal SCSI cable (2)
!
External SCSI cable (2)
!
SCSI terminator (2)
!
SCSI 68-to-50 pin (wide-narrow) converter (2)
!
Tie wraps
!
Screw (4 pan head screws)
!
Countersunk screw (2)
!
4-50 CRU Replacement and Server Upgrades
This procedure is for tower-based systems only.

Advertisement

Table of Contents
loading

Table of Contents