Figure 3-13 Inserting The Cf Card; Figure 3-14 Prg90-04 Display; Figure 3-15 Next Prg Display - NEC SL1100 Hardware Manual

Hide thumbs Also See for SL1100:
Table of Contents

Advertisement

ISSUE 5.0
2.
Turn the power on, enter the Program Mode then PRG90-04.
Base Service OP1 OP2
3.
Dial 1 and press Hold key.
4.
When the data backup to the CF card is completed, the display changes to the next PRG.
Loading System Data
5.
Remove the CF card and exit from the Program Mode.
Hardware Manual
CF card

Figure 3-13 Inserting the CF card

Program Mode

Figure 3-14 PRG90-04 Display

Figure 3-15 Next PRG Display

CPU card
CF Slot (CN2)
VMDB
90-04-01
Data Load YES:1 1
90-05-
M'tenance
Slot Control
back
Select
SL1100
|01
3-7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents