Testing Link End Hardware; Testing When Poe Leds Do Not Illuminate Correctly; Testing After A Lightning Strike - Motorola PTP 250 User Manual

Power over ethernet injector unit, poe power supply
Hide thumbs Also See for PTP 250:
Table of Contents

Advertisement

Testing link end hardware

Testing link end hardware
This section describes how to test the link end hardware, either when it fails on
startup, or after a lightning strike.
Before testing link end hardware, confirm that all outdoor drop cables, that is those
that connect the ODU to equipment inside the building, are of the supported type, as
defined in
NOTE

Testing when PoE LEDs do not illuminate correctly

If the DATA & POWER OUT and DATA IN LEDs do not illuminate correctly during the
start-up sequence, test the link end as described in
the detailed test procedures that follow.

Testing after a lightning strike

If the installation has been struck by lightning, proceed as follows:
1
Test the link end as described in
detailed test procedures that follow.
Ensure that the PoE power supply is working and that the resistances
2
are correct as specified in
cable
3
If the ODU is not working, power off the ODU and LPU and return them
to Motorola.
4
If the ODU is working but there is suspicion of damage to the LPU, then
refer to
8-2
Installation inventories
These tests apply to installations that use the PoE power supply. If the PIDU
is installed instead of the PoE power supply, the test procedures will be
different.
on page 8-10.
LPU Operational Troubleshooting (phn-1362)
on page 4-2.
Test flowcharts
Test flowcharts
Test resistance at the PoE end of the drop
Chapter 8 Troubleshooting