Further Reading On Cabling And Lightning Protection - Motorola PTP 250 User Manual

Power over ethernet injector unit, poe power supply
Hide thumbs Also See for PTP 250:
Table of Contents

Advertisement

Cabling and lightning protection

Further reading on cabling and lightning protection

For more information on cabling and lightning protection, refer to the following:
x
Maximum cable lengths
interface cables in PTP 250 installations.
x
Grounding and lightning protection
lightning protection requirements of a PTP 250 installation.
x
Installation inventories
installations, including cables, connectors, grounding kits and LPUs.
x
Installing the drop cable and LPU
cable from the ODU to the LPU and PoE power supply, and to provide grounding
for the installation.
x
Installing the PoE power supply
indoor cables to connect to the network.
x
Testing after a lightning strike
after a PTP 250 installation is struck by lightning.
1-16
on page
2-5
gives maximum permitted lengths of
on page
on page
4-2
lists the components required for PTP 250
on page
5-14
on page
5-27
on page
8-2
describes testing to be performed
Chapter 1 Product description
2-11
describes the grounding and
describes how to install the drop
describes how to prepare the
phn-2182_002v000
May 2011

Advertisement

Table of Contents
loading

Table of Contents