NEC Express5800 series User Manual page 158

Hide thumbs Also See for Express5800 series:
Table of Contents

Advertisement

Hold the handles and slowly pull out the server from the rack.
4.
The server is latched when a "click" is heard.
When inserting the server back into the rack, push the release
NOTE:
levers on the rails on the sides of the server to unlatch the server. Be
very careful not to get your finger caught in doing so.
Top Cover
Open the top cover when installing/removing an internal device or reconnecting an internal
cable.
Removal
See the section "Preparing for Installation and Removal" described earlier to prepare.
1.
2.
Pull out the server from the rack.
3.
Slide the top cover toward the rear of the server while pressing the lock button on the
cover.
4.
Lift off the top cover from the server.
Installation
When installing the top cover, confirm that the tab of the cover is securely inserted into the slot
in the server frame.
148 Upgrading Your NEC Storage
Handles
Set screws

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storage ns420

Table of Contents