Preparing Your System For Upgrade; Equipment Log; Removing The Front Door - NEC Express5800 series User Manual

Hide thumbs Also See for Express5800 series:
Table of Contents

Advertisement

Preparing Your System for Upgrade

Have the following tools available:
!
Phillips screwdriver (#2 bit)
!
flat-head screwdriver
!
small needle nose pliers
!
pen or pencil
!
utility knife
!
ESD workstation or antistatic wrist strap (recommended).

Equipment Log

Use the equipment log form located at the end of this guide to record the model
and serial number of your system, all installed options, and any other pertinent
information specific to your system. You need this information when
configuring your system.

Removing the Front Door

Note:
To remove the front door of the tower cabinet, perform the following (see
Figure 4-1.).
1. Observe the safety and ESD precautions listed at the beginning of this
chapter.
2. Open the front door of the server.
3. Lift the front door upwards until the top and bottom door hinges disengage
from the hinge slots in the chassis.
This procedure is for tower-based systems only.
Figure 4-1. Opening the Front Door
Upgrading Your System 4-5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Express5800/140hc

Table of Contents