Operation Description; Precautions; Emergency Operation Overview - Huawei IDS1000 User Manual

Container data center single-zone fire extinguishing system
Table of Contents

Advertisement

IDS1000 Container Data Center
User Manual

2.1 Precautions

2.2 Emergency Operation Overview

Precautions
Issue 01 (2014-3-15)
2
Before commissioning the fire extinguishing system, ensure that all control cables to fire
cylinder solenoid valves have been disconnected. This prevents the fire extinguishing
equipment from malfunctioning due to improper manual operations or incorrect cable
connections, and further prevents accidental damage. After the commissioning is
complete, reconnect the solenoid valves.
To ensure the normal operation of the fire extinguishing system, the dowel tightening the
solenoid valve and the container valve must be removed. To prevent the fire
extinguishing system from spraying falsely when installing the IT equipment and
commissioning the system, remove the dowel tightening the solenoid valve and the
container valve on the fire cylinder only after you have commissioned the IT equipment
and fire extinguishing system.
Before commissioning the system, perform the jumper operation for the passive output.
Otherwise, the 6 A fuse (5D) on the main board will be damaged.
The main task involves commissioning of fire extinguishing association, which can be
operated only by professionals in this field.
Only qualified personnel are allowed to perform the operation and maintenance (O&M)
on the fire extinguishing system of the container data center.
Before performing routine maintenance of the fire extinguishing system, inform the
related departments of the temporary downtime due to maintenance. In addition, disable
the logical control function of the area or system to prevent false alarms. Inform the
related departments of the system recovery after the maintenance is complete.
Take ESD measures before removing the front panel from the VESDA.
The following contents in this document describe the operation of a single-zone fire
extinguishing system. If the container data center is configured with multiple single-zone
fire extinguishing systems, perform the operation based on corresponding introductions
in this document.
Only qualified personnel are allowed to perform emergency operations.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.

Operation Description

2 Operation Description
8

Advertisement

Table of Contents
loading

Table of Contents