Figure 3-21 Loop fault alarm indicators for the smoke detector and heat detector (Zone 1 for the
smoke detector, and Zone 2 for the heat detector).
Step 7 After the test is complete, reset the gas extinguishing controller.
Step 8 (Optional) Check that the fire control signals are reported to the monitoring center.