Power-On Commissioning; Initial Configuration - Huawei IDS1000 User Manual

Container data center single-zone fire extinguishing system
Table of Contents

Advertisement

IDS1000 Container Data Center
User Manual

3.1 Initial Configuration

Prerequisites
Before commissioning the fire extinguishing system, familiarize yourself with the
configurations of the fire extinguishing system and the layout of each component in the
corresponding solution. For details, see the Container Data Center Initial Configuration
Guide for corresponding solutions.
Procedure
Step 1 Set the output jumper mode of the single alarm (JP8), composite alarm (JP9), and general
fault (JP10) to passive output, as shown in
Issue 01 (2014-3-15)
3
The container data center has been installed and passed installation tests.
You have obtained the Container Data Center Initial Configuration Guide for the
corresponding solution.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.

Power-On Commissioning

Figure
3-1.
3 Power-On Commissioning
12