Installing The Front Tires; Installing The Tie-Down Bracket - Toro Groundsmaster 3300 Series Operator's Manual

All-wheel drive traction unit
Hide thumbs Also See for Groundsmaster 3300 Series:
Table of Contents

Advertisement

5

Installing the Front Tires

Model No. 31902 Only
No Parts Required
Procedure
1.
Use the previously-removed lug nuts to secure
the tires to the wheel hubs
1. Wheel hub
2. Tire
2.
Torque the wheel lug nuts; refer to
Wheel-Lug Nuts (page 52)
(Figure
11).
Figure 11
3. Lug nut
Torquing the
6
Installing the Tie-Down
Bracket
Model No. 31902 Only
Parts needed for this procedure:
1
Tie-down bracket
2
Bolt (3/8 x 3-1/4 inches)
2
Nut (3/8 inch)
Procedure
Use 2 bolts (3/8 x 3-1/4 inches) and 2 nuts (3/8 inch)
to secure the tie-down bracket to the platform
12).
g299550
1. Tie-down bracket
2. Bolt (3/8 x 3-1/4 inches)
14
Figure 12
3. Nut (3/8 inch)
(Figure
g299562

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Groundsmaster 3310 seriesGroundsmaster 3300Groundsmaster 3310319023190331902a ... Show all

Table of Contents