Huawei OceanStor N8500 T Series Installation Manual page 116

Clustered nas storage system
Table of Contents

Advertisement

OceanStor N8500 Clustered NAS Storage System
Installation Guide (for T Series V100R005)
l
l
l
l
Context
Stacking storage devices will damage devices; therefore, storage devices must be placed on
adjustable guide rails.
l
l
l
l
Procedure
Step 1 Install the left adjustable guide rail (with an L identifier).
Issue 02 (2015-09-22)
Marker pen
M6 screws
Square-hole positioning pins (matching square-hole channels)
Round-hole positioning pins (matching round-hole channels)
NOTICE
Each SUC is equipped with a pair of adjustable guide rails.
Guide rails can be flexibly adjusted from 600 mm to 900 mm, and installed in the cabinet
with a depth from 800 mm to 1200 mm.
Adjustable guide rails come preinstalled with square-hole positioning pins. If required,
change square-hole positioning pins to round-hole ones before installing adjustable guide
rails.
NOTE
You can find round-hole positioning pins in the accessory bag delivered with storage devices.
Three M6 screws are used to secure adjustable guide rails.
hole locations.
Figure 6-5 Screw hole locations
NOTE
If there is no scale marked on the channels, mark the scale from the bottom 1 U position upwards. Be sure
to horizontally line up the front and rear of the adjustable guide rail.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6 N8500 Installation (with S5500T Storage System as the
Storage Unit)
Figure 6-5
shows the screw
107