l When peeling off the insulation layer of the power cable, ensure that the conductor of the
l You can adjust L1 according to the length of the ring terminal. L1 = L + (1 or 2) mm.
Table 14-3 Mapping between the cross-sectional area and the length of the insulation layer to
be peeled off (L1)
Cross-Sectional Area (mm
1
1.5
2.5
4
6
10
16
25
35
50
Step 2 Insert the power cable into the heat shrink tube A, as shown in
Step 3 Insert the bare conductor of the power cable into the ring terminal B, and then press the ring
terminal close to the insulation layer C, as shown in
Issue 02 (2015-09-22)
NOTICE
power cable is not scratched.
NOTE
Skilled engineers can determine the length of insulation layer to be peeled off by comparing the cable with
the connector to be crimped.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
2
L1 (mm)
)
7
7
7
8
9
11
13
14
16
16
Figure
14 Making Cables and Connectors
Figure
14-18.
14-18.
320

Advertisement

Table of Contents
loading

This manual is also suitable for:

Oceanstor n8500 v200r002Oceanstor n8500 v100r005

Table of Contents