Installing Adjustable Guide Rails For An Sud - Huawei OceanStor N8500 T Series Installation Manual

Clustered nas storage system
Table of Contents

Advertisement

OceanStor N8500 Clustered NAS Storage System
Installation Guide (for T Series V100R005)
Figure 5-6 Securing the SUC into the cabinet
Step 3 Check the SUC to ensure that it has been properly installed and secured.
----End

5.7 Installing Adjustable Guide Rails for an SUD

Before assembling an SUD, you must install adjustable guide rails to bear it. With the adjustable
guide rails, an SUD can be placed into different depths of cabinets.
Prerequisites
The following tools and materials have been ready:
l
l
l
l
l
Issue 02 (2015-09-22)
Phillips screwdriver (M3 to M6)
Marker pen
M6 screws
Square-hole positioning pins (matching square-hole channels)
Round-hole positioning pins (matching round-hole channels)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5 N8500 Installation (with the S2600T Storage System as the
Storage Unit)
47

Advertisement

Table of Contents
loading

This manual is also suitable for:

Oceanstor n8500 v200r002Oceanstor n8500 v100r005

Table of Contents