5.23 Powering On the N8500

This section explains how to power on the N8500 after it is installed and cabled.
Prerequisites
l
l
l
Context
Before powering on the N8500, observe the following precautions:
Issue 02 (2015-09-22)
Figure 5-33 Using a buckle to secure the AC power cable
Open the buckle, as shown in step 2 of
Lock the buckle to the joint between the AC power cable and socket and secure the AC
power cable to the socket, as shown in step 3 of
NOTE
Before fully closing the buckle, slide the buckle to a proper position where the power cable can be
tightly secured.
Repeat
Step 1
to
Step 2
NOTE
For details on how to route and bundle cables, see
Cable Routing and Bundling
All components have been correctly installed and cabled.
The switch of the PDU or PDB has been turned off.
The power voltage conforms to device requirements.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5 N8500 Installation (with the S2600T Storage System as the
Figure
5-33.
for other power cables.
12 General Cable Routing Description
Technology.
Figure
5-33.
Storage Unit)
and
13 Basic
84

Advertisement

Table of Contents
loading

This manual is also suitable for:

Oceanstor n8500 v200r002Oceanstor n8500 v100r005

Table of Contents