NetCol5000-C030 In-row Chilled Water Smart Cooling
Product
User Manual (Simple Configuration)
3.1 Installation Precautions
To ensure the optimal operating condition and longest service life, install the NetCol5000-C
correctly as required.
Figure 3-1 Maintenance clearance 1 (unit: mm)
Issue 09 (2020-01-10)
Check whether the environment meets the requirements before installation, and whether
reconstruction is needed for routing pipes and cables and constructing ventilation pipes.
Install the NetCol5000-C according to the design drawing and reserve space for
maintenance.
Ensure that a minimum of 900 mm maintenance clearance is reserved in one of front and
back sides, and a minimum of 600 mm maintenance clearance is reserved in the other
side, as shown in the following figures.