SL1000
1. Using supplied four screws, secure the WM Support to the FM/WM Base-F and Base-R.
WM Support
FM/WM Base-F
2. Refer to
Figure 2-44 Wall-Mount Spacing Guide on the next page
drilling holes for 10 mm anchor bolts (locally procured).
Mark and drill the four holes required to install the FM/WM Base.
2-28
Four Screws
(M4 X 8)
Figure 2-43 Bases and Support of the Battery Box
ISSUE 1.0
FM/WM Base-R
for required spacing before
Installation