Check all three switches can fully close after 'close switches operation'. The movable
contacts can fully contact the stationary contacts, below pictures show one passed case
and failed cases.
passed case
Check all three switches can fully open after 'open switches operation'. The clearance
between open contacts should be bigger than 150mm.
Check of the logic and lamp status
For lamp test, the cabinet shall be fed Auxiliary supply, and close Q7101 and Q7151. The
lamps status can be checked as below table.
Item
QS1(Q1) open
QS2(Q2) open
QS3(Q3) close
Bypass mode
Aux Supply lamp
On
QS1(Q1)_close
Off
lamp
QS1(Q1)_open
On
lamp
QS2(Q2)_close
Off
lamp
QS2(Q2)_open
On
lamp
QS3(Q3)_close
On
lamp
QS3(Q3)_open
Off
lamp
QS1(Q1) open
QS1(Q1) close
QS2(Q2) open
QS2(Q2) open
QS3(Q3) open
QS3(Q3) open
OFF mode
On
On
Off
On
On
Off
Off
Off
On
On
Off
Off
On
On
failed case
QS1(Q1)
close
QS2(Q2)
close
QS3(Q3) open
VSD mode
On
On
Off
On
Off
Off
On
Option 101
Result