56 Standard Commissioning Process
•
Connect the 5.5 VDC cable to power module X1 and PC.
Note: terminal DC+ is the one which close to the fiber terminal.
•
The Tera Term will ask you whether to erase the flash.
Note: If no action in 5 seconds, we need reboot the board.