90 Standard Commissioning Process
When a component is changed, the new serial number should be reported. If a
component is added, removed or replaced with a different part number, this is updated
in the BOM in order to show what is currently installed in the drive. Fill in the
responding information in the blanks below.
If the serial number and position number of the 'fault material' is just the same with the
ones in original BOM, fill in 'right' in 'part status', if not, fill in 'wrong'. After saving the
date, the material which has been revised will changed as picture below. Make sure
the serial number of the Material you return to factory is filled in correctly.