ABB ACS580MV Commissioning Manual page 47

200kw to 6300 kw,3.3kv to 11 kv
Hide thumbs Also See for ACS580MV:
Table of Contents

Advertisement

Run the PROG_MHDCH.bat batch file to program the control hub. (folder:
\03_Controlhub FW)
Note: If the error information like below, it means that the location of the IMPACT program
needs to be added to the system path.
Standard Commissioning Process 47