Type e to erase the flash, once erasing done, step to Ready for application code
transfer...
Open the File/Send file..., select the PEBB1_CellController.bin from the software
package (folder \02_PowerModule SW).
Note: Confirm the Binary is enabled.
Standard Commissioning Process 57