Securing The Cabinet - Huawei NetCol5000-A050 User Manual

In-row air cooled smart cooling product
Hide thumbs Also See for NetCol5000-A050:
Table of Contents

Advertisement

NetCol5000-A050 In-row Air Cooled Smart Cooling
Product
User Manual (1350 mm Depth)
Figure 4-18 Removing the sheet metal
----End

4.4.3 Securing the Cabinet

Step 1 Determine the installation position.
Step 2 Drill mounting holes using a hammer drill.
Step 3 Push the cabinet to the installation position.
Step 4 Level the cabinet using an adjustable wrench.
● Do not remove anchor bolts. Otherwise, you need to rework them for use.
● Anchor bolt adjustment method: Wrench an anchor bolt clockwise to elevate a
cabinet, or wrench an anchor bolt anticlockwise to lower it. The anchor bolts
can be adjusted within a range of 0–8 mm.
● Levelness check standard: Ensure that the cabinet is level in width and depth
directions when leveling the cabinet. Put a level at the bottom of the cabinet in
width and depth directions and check that the air bubble is in the middle
between the two lines marked on the glass tube.
Issue 04 (2022-12-15)
NO TE
This section describes how to install the cabinet on the concrete floor.
NO TICE
Copyright © Huawei Digital Power Technologies Co., Ltd.
4 System Installation
66

Advertisement

Table of Contents
loading

This manual is also suitable for:

Netcol5000-a050h4we2Netcol5000- a050h40e2

Table of Contents