Installing A Fusioncol8000-E; Unpacking And Checking; Securing A Smart Cooling Product - Huawei FusionCol8000-E240 User Manual

Modular indirect evaporative cooling system
Hide thumbs Also See for FusionCol8000-E240:
Table of Contents

Advertisement

FusionCol8000-E240 Modular Indirect Evaporative
Cooling System
User Manual

3.3 Installing a FusionCol8000-E

3.3.1 Unpacking and Checking

Procedure
Step 1 Verify that the package is intact. If any damage is found, notify the carrier
immediately.
Step 2 Remove the plastic packaging materials.
Step 3 Check the types and quantity of fittings according to the fitting list. If any fitting is
missing, contact Huawei technical support.
----End

3.3.2 Securing a Smart Cooling Product

Prerequisites
The evenness of concrete platforms is critical to device installation. Ensure that the
height (altitude) difference between platforms does not exceed 5 mm.
Context
Table 3-6 Hoisting precautions
Stage
Before hoisting
During hoisting
Issue 01 (2021-01-30)
NO TICE
Precautions
Ensure that the crane and steel ropes provide the required
bearing capacity.
The doors of devices to be hoisted are closed.
Ensure that the steel ropes are securely connected.
Do not allow any unauthorized people to enter the
hazardous areas and never stand under the crane arm
during hoisting.
Ensure that the crane is properly located and avoid long-
distance hoisting.
Ensure that the device is stable and the diagonal gradient
of the device is less than or equal to 5 degrees.
Copyright © Huawei Technologies Co., Ltd.
3 System Installation (Building Scenario)
35

Advertisement

Table of Contents
loading

Table of Contents