Optional) Power-Off; Checking After Commissioning - Huawei FusionCol8000-E240 User Manual

Modular indirect evaporative cooling system
Hide thumbs Also See for FusionCol8000-E240:
Table of Contents

Advertisement

FusionCol8000-E240 Modular Indirect Evaporative
Cooling System
User Manual
----End

6.7 (Optional) Power-off

Context
In shutdown mode, the Shutdown button is green (unavailable) and the Start
button is gray (available).
Procedure
Step 1 Tap Shutdown on the home screen. A warning is displayed, indicating whether to
shut down the smart cooling product.
Step 2 Tap Confirm. If the device is successfully shut, the system displays a message,
indicating that the command is successfully triggered.
Step 3 Switch off the smart cooling product circuit breaker on PDC.
----End

6.8 Checking After Commissioning

Table 6-11 Commissioning checklist
Check Item
The foreign matter on the water pan and bottom plate is
cleaned up.
The air filter is correctly installed according to the airflow
direction marked on the frame.
Condensate water in the water pan is drained smoothly.
All adjustable side panels have been installed.
Issue 01 (2021-01-30)
NO TE
● When you enter the screen for selecting commissioning items for the first time, all items
are selected by default.
● After commissioning for a component succeeds, the system automatically performs
commissioning for the next component you selected. If commissioning fails, wizard
startup ends.
Copyright © Huawei Technologies Co., Ltd.
6 Power-On Commissioning
Check Result
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
124