NAP- 200-003
Sheet 11/29
Installation of Main Equipment
(7)
For floor and wall-mounted installations, refer to Figures 003-11 to 003-18 for the recommended layout of
the modules.
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
100
Pair
(L)
SHELF 1
MIN. BACKUP,
26 A-H
SHELF 2
MED. BACKUP,
52 A-H
MDF0
or
TPF0
MDF0(L)
LTC1
MDF0(L)
LTC0
-
+
SHELF 1
MIN. BACKUP,
PS12260
26 A-H
SHELF 2
-
+
MED. BACKUP,
PS12260
52 A-H
Figure 003-11 Modular Layout for 1 PIM Configuration
10 Pair
10 Pair
MDF0
10 Pair
10 Pair
or
10 Pair
10 Pair
TPF0
10 Pair
10 Pair
10 Pair
10 Pair
100
100
MDF0(L)
Pair
Pair
(L)
(L)
-
-
+
+
PS12260
-
+
-
+
BATTM0
Figure 003-12 Modular Layout for 2 PIM Configuration
Notes: - MDF cable lengths are 1.5 metres
PIM0
-
MDF0(L)
LTC2
+
240V AC
-
+
PS12260
-
+
PS12260
BATTM0
Notes: - MDF cable lengths are 1.5 metres
PIM1
MDF0(R)
LTC1
MDF0(R)
LTC0
LTC2
PIM0
MDF0(L)
-
LTC1
+
MDF0(L)
MDFO(L)
LTC0
LTC2
Power Board
AD-25182501
- MDF0 must be minimum 300mm
above floor.
- PIM0) - LTC0-2 connect to (L) Krone
(MDF0).
- 240V direct to wall outlet.
- BATTM0 can be supplied for external
battery backup either as MIN. or MED.
backup configuration.
- If BATTM0 is not required use dummy
module.
- If a 78A-H battery is required, add
another BATTM.
- Can be mounted on floor.
- PIM1 - LTC 1-2 connect to (R) Krone (MDF0)
- LTC0 connect to Krone (MDF0)
- 240V connects to 4 way power board.
- BATTM0 can be supplied for external
battery backup either as MIN. or MED.
backup configuration.
- If BATTM0 is not required use dummy module.
- If a a 78A-H battery is required, add another
BATTM plus dummy module.
240V AC
CHAPTER 3
Page 29
Revision 1.0.1