NAP- 200-003
Sheet 3/29
Installation of Main Equipment
(2)
When the system is a multiple-PIM configuration, connect the RACK PARTS to each other as shown in
Figure 003-3. Position the BASE over the holes drilled as per Figure 002-1, and secure the BASE to the
floor, using anchor bolts.
RACK PARTS
REAR
Figure 003-3 Connection of RACK PARTS
AD-25182501
RACK PARTS
BASE
CHAPTER 3
Page 21
Revision 1.0.1