NEC NEAX 7400 ICS Installation Manual page 53

Table of Contents

Advertisement

NAP- 200-003
Sheet 21/29
Installation of Main Equipment
19"KRONE
BACK MOUNT
(MDF/TPF)
19"KRONE
BACK MOUNT
(MDF/TPF)
SHELF 3
MAX. BACKUP,
78 A-H
(SHELF 1+2+3)
SHELF 2
MED. BACKUP
52 A-H
(SHELF 1+2)
SHELF 1
MIN. BACKUP
26 A-H
Note: For intra-PIM battery cabling, see NAP-200-005.
L = Left
C = Centre
R = Right
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
100
100
100
Pair
Pair
Pair
(L)
(L)
(L)
_
_
+
+
12V
12V
26A-H
26A-H
_
_
+
+
12V
12V
26A-H
26A-H
_
_
+
+
12V
12V
26A-H
26A-H
REAR VIEW
Figure 003-21 3 PIM Configuration (19"Rack Mount)
MDF (C)
MDF (C)
LTC0
MDF (L)
LTC0
MDF (L)
MDF (L)
LTC0
POWER BOARD
FRONT VIEW
AD-25182501
PIM2
LTC1
MDF (R)
LTC2
PIM1
MDF (C)
LTC1
MDF (C)
LTC2
PIM0
LTC1
MDF (L)
LTC2
240 V AC
CHAPTER 3
Page 39
Revision 1.0.1

Advertisement

Table of Contents
loading

This manual is also suitable for:

120

Table of Contents