NEC NEAX 7400 ICS Installation Manual page 42

Table of Contents

Advertisement

NAP- 200-003
Sheet 10/29
Installation of Main Equipment
(6)
When mounting the RACK PARTS to a wall, connect all the RACK PARTS to each other, and connect the
BASE to the bottom RACK PARTS using the M5 Machine screws (provided), as shown in Figure 003-10.
BASE
CHAPTER 3
Page 28
Revision 1.0.1
(JOINT)
(JOINT)
Figure 003-10 Screwing the RACK PARTS and the BASE
RACK PARTS
M5 MACHINE SCREW-C
(x2/JOINT AREA)
(PROVIDED WITH RACK PARTS)
AD-25182501

Advertisement

Table of Contents
loading

This manual is also suitable for:

120

Table of Contents