NEC NEAX 7400 ICS Installation Manual page 57

Table of Contents

Advertisement

NAP- 200-003
Sheet 25/29
Installation of Main Equipment
(1) Confirm the connection of the PWR CNT CA-A and power/ringer cables as shown in Figure 003-25 (These
cables are pre-installed).
PIM
PZ-PW86
BWB (Back Wiring Board)
CARD SLOT AREA
PWR0B PWR0A
RS
LTC CONNECTOR AREA
PWR1
PWR CNT CA-A
POWER OUTPUT CABLE (CR,E)
POWER OUTPUT CABLE (+5V, -27V, E)
Figure 003-25 Cable Connection between the PZ-PW86 and the BWB
AD-25182501
CHAPTER 3
Page 43
Revision 1.0.1

Advertisement

Table of Contents
loading

This manual is also suitable for:

120

Table of Contents