NEC NEAX 7400 ICS Installation Manual page 74

Table of Contents

Advertisement

NAP- 200-005
Sheet 4/4
Connection of Battery
2. External Battery Connection
When using an external battery, provide the following connections.
Notes: 1. One battery pack is required for each 4-PIM stack, to ensure that sufficient recharge current is
available.
2. The capacity of each external battery is determined by the customers' back-up requirements.
3. CAUTION: For both sealed and vented batteries, set the "mode" switch on the PZ-PW86/PZ-
PW86(A) unit(s) to the correct Float Voltage. The "Equalize" option applies ONLY to external
vented batteries for periodic equalize (BOOST) charging, which can be done on-line. When the
BATTM is used, the battery capacity is in multiples of 26 A-H, up to a maximum of three sets in
parallel for each PIM stack.
PIM3
PIM2
PIM1
PIM0
BATTM
(Option)
.
CHAPTER 3
Page 60
Revision 1.0.1
PWR
CA-A
CABLE
BATTERY CABLE
+
12V
26 A-H
26 A-H
Figure 005-5: External Battery Connection for 8 PIMs Configuration
PZ-PW86
BATT2
PIM7
BATT1
PWR
CA-A
CABLE
PZ-PW86
BATT2
PIM6
BATT1
PZ-PW86
BATT2
PIM5
BATT1
PWR
CA-A
CABLE
PZ-PW86
BATT2
PIM4
BATT1
+
BATTM
12V
(Option)
AD-25182501
PZ-PW86
BATT2
BATT1
PZ-PW86
BATT2
BATT1
PWR
CA-A
CABLE
PZ-PW86
BATT2
BATT1
PZ-PW86
BATTERY CABLE
BATT2
BATT1
+
12V
12V
26 A-H
26 A-H
PWR
CA-A
CABLE
PWR
CA-A
CABLE
+

Advertisement

Table of Contents
loading

This manual is also suitable for:

120

Table of Contents