NEC NEAX 7400 ICS Installation Manual page 31

Table of Contents

Advertisement

NAP- 200-002
Sheet 1/2
Marking and Drilling
1. Confirmation of the Equipment Layout
Install the equipment in an area which provides adequate ventilation and is easily accessible to service personnel.
2. Marking and Drilling
2.1 Floor Standing
• By referring to Figure 002-1, mark and drill the installation holes for the main equipment.
• Mark and drill the installation holes for the external BATTM and MDFM, if required.
Refer to Figure 003-1 for details.
39
110
35
37
Figure 002-1 Floor Marking for Main Equipment
AD-25182501
WALL
RACK PARTS
356
37
430
FRONT
40
184
UNIT: mm
Revision 1.0.1
CHAPTER 3
Page 17

Advertisement

Table of Contents
loading

This manual is also suitable for:

120

Table of Contents