Pioneer QUANTUM INVERTER Series Service & Troubleshooting Manual page 8

Hide thumbs Also See for QUANTUM INVERTER Series:
Table of Contents

Advertisement

• The refrigerant charge shall be recovered into the
correct recovery cylinders. The system shall be flushed
with OFN to render the unit safe. This process may
need to be repeated several times. Compressed air or
oxygen shall not be used for this task. Flushing shall
be achieved by breaking the vacuum in the system
with OFN and continuing to fill until the working
pressure is achieved, then venting to atmosphere, and
finally pulling down to a vacuum. This process shall
be repeated until no refrigerant is within the system.
When the final OFN charge is used, the system shall
be vented down to atmospheric pressure to enable
work to take place. This operation is absolutely vital if
brazing operations on the pipe-work are to take place.
• Ensure that the outlet for the vacuum pump is not
close to any ignition sources and there is ventilation
available.
2.16 Charging procedures
• In addition to conventional charging procedures, the
following requirements shall be followed:
• Ensure that contamination of different refrigerants
does not occur when using charging equipment.
Hoses or lines shall be as short as possible to
minimize the amount of refrigerant contained in
them.
• Cylinders shall be kept upright.
• Ensure that the refrigeration system is earthed prior
to charging the system with refrigerant.
• Label the system when charging is complete (if not
already).
• Extreme care shall be taken not to overfill the
refrigeration system.
• Prior to recharging the system it shall be pressure
tested with OFN. The system shall be leak tested on
completion of charging but prior to commissioning.
A follow up leak test shall be carried out prior to
leaving the site.
2.17 Decommissioning
Before carrying out this procedure, it is essential that the
technician is completely familiar with the equipment and
all its detail. It is recommended good practice that all
refrigerants are recovered safely. Prior to the task being
carried out, an oil and refrigerant sample shall be taken.
In case analysis is required prior to re-use of reclaimed
refrigerant. It is essential that electrical power is available
before the task is commenced.
• Become familiar with the equipment and its operation.
• Isolate system electrically.
• Before attempting the procedure ensure that:
• Pump down refrigerant system, if possible.
• If a vacuum is not possible, make a manifold so that
• Make sure that cylinder is situated on the scales before
• Start the recovery machine and operate in accordance
• Do not overfill cylinders. (No more than 80 % volume
• Do not exceed the maximum working pressure of the
• When the cylinders have been filled correctly and the
• Recovered refrigerant shall not be charged into
2.18 Labelling
• Equipment shall be labelled stating that it has been de-
• The label shall be dated and signed. Ensure
2.19 Recovery
• When removing refrigerant from a system, either for
• When transferring refrigerant into cylinders, ensure
Safety Precautions 5
• mechanical handling equipment is available, if
required, for handling refrigerant cylinders;
• all personal protective equipment is available and
being used correctly;
• the recovery process is supervised at all times by a
competent person;
• recovery equipment and cylinders conform to the
appropriate standards.
refrigerant can be removed from various parts of the
system.
recovery takes place.
with manufacturer's instructions.
liquid charge).
cylinder, even temporarily.
process completed, make sure that the cylinders and
the equipment are removed from site promptly and all
isolation valves on the equipment are closed off.
another refrigeration system unless it has been cleaned
and checked.
commissioned and emptied of refrigerant.
that there are labels on the equipment stating the
equipment contains flammable refrigerant.
servicing or decommissioning, it is recommended good
practice that all refrigerants are removed safely.
that only appropriate refrigerant recovery cylinders
are employed. Ensure that the correct numbers of
cylinders for holding the total system charge are
available. All cylinders to be used are designated
for the recovered refrigerant and labelled for that
refrigerant (i.e. special cylinders for the recovery of
refrigerant). Cylinders shall be complete with pressure
relief valve and associated shut-off valves in good
working order.

Advertisement

Table of Contents
loading

Table of Contents