Figure 009-3 Mdf Cross Connection For The Pft (Pz-8Pfta) - NEC NEAX 2000 IVS Installation Manual

Hide thumbs Also See for NEAX 2000 IVS:
Table of Contents

Advertisement

NAP 200-009
Sheet 3/6
Installation of Back up MP System
Figure 006-35
shows the MDF cross connection for the No. 0 circuit on the PFT (PZ-8PFTA), as an exam-
ple.
PIM0
PN-4LC
R0
LEN0000
T0
(No. 0)
R1
LEN0001
T1
(No. 1)
LT00
R2
LEN0002
T2
(No. 2)
R3
LEN0003
T3
(No. 3)
PN-4COT
R0
LEN0004
T0
(No. 0)
R1
LEN0005
T1
(No. 1)
LT01
R2
LEN0006
T2
(No. 2)
R3
LEN0007
T3
(No. 3)
PZ-PW86
–27V
G
LTC0
J
P
1
1
26
26
2
2
27
27
3
3
28
28
4
4
29
29
5
5
30
30
6
6
31
31
7
7
32
32
8
8
33
33
25
50
INSTALLATION CABLE

Figure 009-3 MDF Cross Connection for the PFT (PZ-8PFTA)

MDF
Tip
Ring
Tip
Ring
Sta. R0
Sta. T0
4LC. R0
4LC. T0
C.O. R0
C.O. T0
4COT. R0
4COT. T0
ND-45492 (E)
TO C.O. LINE
TO STATION
PZ-8PFTA
PFT0
1
26
2
27
No. 0
3
28
4
29
P
J
PFT1
23
48
24
49
E
25
50
–27V
P
J
CHAPTER 3
Revision 2.0
Page 147

Advertisement

Table of Contents
loading

Table of Contents