Figure 003-9 Cable Connection On The Pz-Pw86 (Continued) - NEC NEAX 2000 IVS Installation Manual

Hide thumbs Also See for NEAX 2000 IVS:
Table of Contents

Advertisement

NAP 200-003
Sheet 10/37
Installation of Main Equipment
(b) PZ-PW86 (C)
BATTERY MODE SWITCH
1: NO CONNECTION
2: ON: SEAL/FLOAT 2
OFF: OPEN/FLOAT 1
TO AUXILIARY
EQUIPMENT
TO PWR1
CONNECTOR
PWR CNT CA-A
TO OTHER
PZ-PW86
PWR CA-A
TO BATTERY OR
OTHER PZ-PW86
BATTERY CABLE/PWR CA-A
WHITE
BLACK
CHAPTER 3
Page 32
Revision 2.1
PZ-PW86(C)
MJ
MN
ON
ON
1
Note 1
2
GND Note 2
FG
–27V
ON
OFF
100/120V
GREEN
AC CORD-A
TO AC MAINS INPUT
(FOR 1-PIM SYSTEMS)
OR
TO THE TERMINAL BLOCK AT BASE
(FOR MULTIPLE PIM SYSTEMS)
(See
AC CORD-B
Figure 003-9 Cable Connection on the PZ-PW86 (2 of 3)
Follow the Label on Front Plate of the PZ-
Note 1:
PW86(C).
Note 2:
If GND (Signal GND) has to be separated from
FG (Frame GND), remove the link between
GND and FG terminals.
POWER OUTPUT
CABLE (+5V, –27V,E)
POWER OUTPUT
CABLE (CR, E)
TO PWR0A CONNECTOR
TO PWR0B CONNECTOR
TO PWR0D CONNECTOR
POWER OUTPUT CABLE (+90V,E)
BATTERY CONNECTOR (BATT2)
O
BATTERY CONNECTOR (BATT1)
CAUTION
Set the appropriate voltage before turning on
the SW switch.
240V
TO
Figure
003-11)
ND-45492 (E)
Addendum-001
JANUARY, 1999
FRAME GROUND TERMINAL ON THE CHASSIS
(FOR 1-PIM SYSTEMS)
L
N
TO TERMINAL
NOMINAL
AC INPUT
MARKED:
ON BASE

Advertisement

Table of Contents
loading

Table of Contents